General Feedback:

  • Contents/Information: Satisfactory
  • Time Allocation: Adequate
  • Consider adding more hyperlinks from methods/equations to the User Manual and Technical Reference Manual
  • Include additional case studies on a larger scale, providing comparisons with various debris analysis cases, not limited to just the Brand DB case.

Day 1:

  • Workshop 1: Consider splitting this workshop into two sessions as the current duration appears too long (2 hours).

Day 2:

  • Lecture 4: Enhance the lecture by providing additional descriptions and explanations for the Reservoir Volume Reduction Method, including its purposes.
  • Lecture 5: Expand the content by including more information on water routing methods and sediment routing methods.
  • Consider moving Lecture 6: Post-Wildfire Hydrology Analysis to a position before the Debris Lectures for improved flow and coherence in the course.

Day 3 & 4:

  • Retain:
    • Quiz Games
    • Lab Activities
    • Lecture Sessions following Workshops and Review Sessions (Effective)
    • Detailed Step-by-Step Introduction for Workshop (Effective)
  • Include/Add:
    • Homework Projects and Assignments
    • Initial 2-Hour HEC-RAS Introduction
    • Comprehensive Coverage of Movable Bed Sediment Routing
    • Streamline the Data Transition Process from HEC-HMS to HEC-RAS
    • In-Depth Exploration of Large-Scale Project Case Studies
    • Enhance Workshop Materials by Establishing More Links to User's Manual and Reference Materials
    • Provide Background Information on Diffusion Wave and Shallow Water Equation
  • Remove:

    • Minimize Introductory Materials (Transfer to Homework Assignments)