| FY26 Crazy Mountain Reservoir Regulation Manual | Last Modified: 2026-01-28 15:35:26.241 | Manual created for the #098 PROSPECT HEC-ResSim Workshops. Contains pertinent information for completing the workshops. |
| FY26 Workshop 1 – Watershed Setup & Network Development | Last Modified: 2026-01-27 08:55:50.378 | Create a reservoir network. Add reaches to complete connectivity. Entering reach properties, reservoir pool and dam definition, and outlets and define outlet properties. Creating an operation set. |
| FY26 Workshop 2 – Basic Guide Curve Operations | Last Modified: 2026-01-28 15:41:56.957 | Create a simple operation set and define its zones – Guide Curve definition. Create alternatives and simulations. Perform both high and low flow simulations. Gain understanding of guide curve operation. |
| FY26 Workshop 3 – Creating At-Site Operating Rules | Last Modified: 2026-01-27 08:51:44.989 | Develop an operation set and its associated alternative for each rule type. Gain familiarity with the Release Function editor and each type of “at-site” rule. |
| FY26 Workshop 4 – Multiple Rules Operation | Last Modified: 2026-01-27 08:56:07.175 | Add a downstream control rule to an existing operation set. Prioritize the rules in the operation set. Understand how downstream operation and rule prioritization influence release decisions. |
| FY26 Workshop 5 – Induced Surcharge Operation | Last Modified: 2026-01-29 23:39:44.828 | Duplicate existing operation set. Add emergency operation zone to new operation set. Add induced surcharge rule. Duplicate alternative. Change operation set to new set in new alternative. Edit simulation, adding new alternative. Update from base. Analyze difference in operation. |
| FY26 Workshop 6 – System Operations | Last Modified: 2026-02-04 15:14:42.713 | Part A – review Guide Curve operations. Part B – add an implicit, parallel reservoir system. Part C – add an implicit, tandem reservoir system. Part D – add an explicit reservoir system and define the storage balance scheme. Analyze operations, changes in reservoir storage management and downstream regulation. |
| FY26 Workshop 7 – Hydropower, Adding Power Plants and Generating Power | Last Modified: 2026-01-28 14:46:48.142 | Add a power plant and analyze standard operations without energy demand (secondary power production). Add a scheduled energy requirement to the operations and analyze impact of power requirement on results. Become familiar with hydropower output options. |
| FY26 Workshop 8 – If-Then-Else Rules and Scripting | Last Modified: 2026-01-31 14:31:46.542 | Creating If-Then-Else rules. We will start with a watershed that already has a state variable defined. We will use that state variable within the condition of an If block. We will analyze the behavior and influence of the If block on the release decision logic/determination. |
| FY26 Workshop 9 – Tying It All Together | Last Modified: 2026-01-27 08:53:34.346 | Run and analyze different ResSim model exercises, then solve modeling issues and answer questions presented in the problem statement. |