Purpose
In this hands-on workshop participants use their previously generated HEC-FDA study files to evaluate the economic feasibility and project performance of various levee alternatives. Participants recommend the “best" alternative.
Last Updated

Last Modified: 2026-07-30 11:29:25.17

Downloadable Materials
  • Review the Example Study Data for Version 2 to familiarize with some of the data in this workshop. 
  • The starting point for this Workshop 5 is the resulting study files from Workshop 4. You may EITHER:

Workshop Overview

The purpose of this workshop is for students to be able to:

  • Evaluate three levee plans (aka. scenarios) for an impact area during analysis of the without-project condition.
  • Formulate and evaluate alternative levee sizes for the impact area.
  • Compute and review results for the base year and most likely future year
  • Specify a recommended levee plan based on the economic and hydraulic performance formulation/evaluation results.
  • Determine if the recommended plan (scenario) meets present FEMA floodplain levee certification criteria.

At the conclusion of the workshop the student will be able to perform a conventional levee analysis as required by present USACE guidance and ascertain if the recommended plan, if any, meets Federal Emergency Management Agency (FEMA) criteria for levee certification.

Introduction

Having completed Workshops 1-4, you should have the ability to model an alternative. Provided the inputs, you can produce an estimate of equivalent annual damages for multiple alternatives to compare to the without-project existing conditions. In this workshop, you'll model two different sized levees (a low levee with and without armor and a high levee). You'll be asked to think critically as you compare the results of the three with-project levees against the without-project conditions and consider which levee you might choose if you were so tasked.

A levee alternative is modeled similarly to the way you modeled the without project conditions. To model a levee, you need to:

  • Import levee specific Hydraulic Data
  • Create Lateral Structure - a lateral structure indicates the levee's system response function, or the relationship between stage and levee failure
  • Create new Stage-Discharge Function - with a levee in place, stage for a given discharge increases in the channel
  • Create new Scenarios - two new scenarios per levee are required, base and future year
  • Create new Alternative - with new base and future year Scenarios, equivalent annual damages can be estimated

The proposed levees have heights that reach elevations of 946 ft and 947.5 ft. The levees are being proposed to benefit the Left-Bank Impact Area and have the exact same footprint, with only the height being different. Only one of the two levee options can be chosen.

Study Elements and Study Data Overview Table
Study Tree ElementStudy DataInstructions for Adding Study Data
TerrainMuncie TerrainPreviously completed in WS1 Intro to HEC-FDA Software
Impact Areas SetMuncie Impact AreasPreviously completed in WS1 Intro to HEC-FDA Software
Hydraulics
  • Existing Conditions
  • Low Levee*
  • High Levee*
  • Existing conditions (Unsteady HDF) previously completed in WS2 H&H Uncertainties
  • Low Levee (Unsteady HDF) imported in this workshop in Task 2.1.
  • High Levee (Unsteady HDF) imported in this workshop in Task 2.2.
Frequency Functions
  • Flow-Frequency LPIII
  • Flow-Frequency LPIII distribution for the without-project (existing) conditions. This was previously completed in WS2 H&H Uncertainties
Stage Transform Functions > Stage-Discharge Functions
  • Existing Conditions (Bank 943)
  • Low Levee (TOL 946 ft)*
  • High Levee (TOL 947.5 ft)*
  • This stage-discharge function represents the relationship between stage and discharge for the without-project condition. Previously completed in WS2 H&H Uncertainties
  • The stage-discharge function below represents the with-project condition for the low levee (top of levee 946 ft). Completed in this workshop in Task 3.1
  • The stage-discharge function below represents the with-project condition for the high levee (top of levee 947.5 ft). Completed in this workshop in Task 3.2.
Lateral Structures
  • LL_NoArmor*
  • LL_wArmor*
  • HL_POF*
  • System response curve for the proposed low levee, without Armor, in the Left-Bank impact area with a top elevation of 946 feet. Created in this workshop in Task 4.
  • System response curve for the proposed low levee, with Armor, in the Left-Bank impact area with a top elevation of 946 feet. Created in this workshop in Task 4.
  • System response curve for the proposed high levee located in the Left-Bank impact area with a top elevation of 947.5 feet. Created in this workshop in Task 4.

Economics > Occupancy Types

NSI_OccTypes

Previously imported in WS3 Economic Consequences with Uncertainty

Economics > Structure Inventories

  • Base_WOP_SI
  • Future_WOP_SI

Economics > Aggregated Stage-Damage Functions

  • WOP Base Year
  • WOP Future Year
  • LL Base Year*
  • LL Future Year*
  • HL Base Year*
  • HL Future Year*
  • Base year without-project (existing conditions) hydraulics and base year inventory for the without-project conditions. Previously completed in WS3 Economic Consequences with Uncertainty
  • Future year without-project (existing conditions) hydraulics and future year inventory for the without-project conditions. Previously completed in WS4 Without-Project Conditions
  • Low levee hydraulics and the base year inventory for the base year with-project conditions imported in this workshop in Task 5.1.
  • Low levee hydraulics and the future year with-project inventory for the with-project conditions most likely future year imported in this workshop in Task 5.1. 
  • High levee hydraulics and the base year inventory for the base year with-project conditions imported in this workshop in Task 5.2.
  • High levee hydraulics and the future year with-project inventory for the with-project conditions most likely future year imported in this workshop in Task 5.2.

Scenarios

  • Base Year Without Project
  • Future Year Without Project
  • LowLevee Base*
  • LowLevee Future*
  • LowArmoredLevee Base*
  • LowArmoredLevee Future*
  • HighLevee Base*
  • HighLevee Future*
  • Base year without-project (existing conditions) scenario created previously in WS4 Without-Project Conditions
  • Future year without-project (existing conditions) scenario created previously in WS4 Without-Project Conditions
  • Base year with low levee (no Armor) project scenario created in this workshop in Task 6.
  • Future year with low levee (no Armor) project scenario created in this workshop in Task 6.
  • Base year with low levee (with Armor) project scenario created in this workshop in Task 6.
  • Future year with low levee (with Armor) project scenario created in this workshop in Task 6.
  • Base year with high levee project scenario created in this workshop in Task 6.
  • Future year with high levee project scenario created in this workshop in Task 6. 

Alternatives

  • Without Project
  • Low Levee*
  • Low Armored Levee*
  • High Levee*
  • Without-project (existing conditions) alternative created previously in WS4 Without-Project Conditions
  • Low levee (no Armor) project alternative created in this workshop in Task 7.
  • Low armored levee project alternative created in this workshop in Task 7.
  • High levee project alternative created in this workshop in Task 7.

Alternative Comparison Report

ComparisonAlternative comparison report to provide damage reduced between the without-project condition and with-project conditions. Created in this workshop in Task 8.

*NEW study data you have not entered in previous workshops. These study elements will be imported, computed and created during this workshop.

Instructions

Task 1 – Open the Starting Workshop 5 Project

  1. Open the HEC-FDA Version 2 software. 
  2. Save and unzip the provided Workshop 4 solution file.
  3. From the File menu, click Open. The Open Study dialog opens as a tab.
  4. Click the ellipse button in the Study Path box to open the Select File browser window.
  5. Navigate to the Workshop 5 starting project (e.g., C:\Workshops\FDA\Workshops\), select the *.sqlite HEC-FDA file and click Open.
  6. From the Open Study tab, click OK.

Alternatively, just reopen your Workshop 4 solution. From the File menu select the top recently opened study (number 1 in the list).

Task 2.1 – Import Low Levee Hydraulic Data

The top of levee for this low levee is 946 ft.

Steps

  1. From the Study Tree under Hydraulics right-click on Unsteady HDF, and click Import Hydraulics. The Import Hydraulics dialog opens as a tab.

    Review the Example Study Data for Version 2 to determine the correct spatial data set type for the Muncie, Indiana Hydraulic study data.

     
  2. From the importer enter a name for the hydraulics profile (e.g., LowLevee_Conditions) and enter a description for the profile.
  3. From the Source Directory box select the ellipse button to open the Select File browser window.
  4. Navigate and select the folder containing the existing conditions hydraulic data (e.g., C:\Workshops\FDA\MuncieData\Hydraulics\Muncie_Low_Levee), and click Select Folder.
  5. The importer tab updates with a table displaying the name of the profiles, the annual exceedance probability and the return interval. The Annual Exceedance Probability will need to be corrected. Manually enter the appropriate AEP value for each profile name based on Table 1.

    Table 1
    NameAnnual Exceedance ProbabilityReturn Interval (Return Period)
    50%ACE-LL0.5





    Updates based on the entered AEP using the equation (1/AEP)

    20%ACE-LL0.2
    10%ACE-LL0.1
    5%ACE-LL0.05
    2%ACE-LL0.02
    1%ACE-LL0.01
    0.5%ACE-LL0.005
    0.2%ACE-LL0.002

    Copy and paste is not an option in the import table. Select each cell to type in the appropriate return interval.

  6. Note that the Return Interval column updates based on the AEP. Check that the AEP and return interval values are correct and click Save. The hydraulic data is added to the Study Tree.
  7. Click Close to close the Import Hydraulics tab.

Task 2.2 – Import High Levee Hydraulic Data

The top of levee for this high levee is 947.5 ft.

Steps

  1. From the Study Tree under Hydraulics right-click on Unsteady HDF, and click Import Hydraulics. The Import Hydraulics dialog opens as a tab. 

  2. From the importer enter a name for the hydraulics profile (e.g., HighLevee_Conditions) and enter a description for the profile.
  3. From the Source File box select the ellipse button to open the Select File browser window.
  4. Navigate and select the folder containing the existing conditions hydraulic data (e.g., C:\Workshops\FDA\MuncieData\Hydraulics\Muncie_High_Levee), and click Select Folder.
  5. The importer tab updates with a table displaying the name of the profiles, the annual exceedance probability and the return interval. The Annual Exceedance Probability will need to be corrected. Manually enter the appropriate AEP value for each profile name based on Table 2.

    Table 2
    NameAnnual Exceedance ProbabilityReturn Interval (Return Period)
    50%ACE-HL0.5





    Updates based on the entered AEP using the equation (1/AEP)

    20%ACE-HL0.2
    10%ACE-HL0.1
    5%ACE-HL0.05
    2%ACE-HL0.02
    1%ACE-HL0.01
    0.5%ACE-HL0.005
    0.2%ACE-HL0.002

    Copy and paste is not an option in the import table. Select each cell to type in the appropriate return interval.

  6. Note that the Return Interval column updates based on the AEP. Check that the AEP and return interval values are correct and click Save. The hydraulic data is added to the Study Tree.
  7. Click Close to close the Import Hydraulics tab. 

Task 3.1 – Enter Stage-Discharge Functions for Low Levee

The top of levee for this low levee is 946 ft.

Steps

  1. From the Study Tree, right-click on Stage-Discharge Functions and select Create New Stage-Discharge Relationship. The Create New Stage-Discharge Relationship opens as a tab.
  2. Enter a name for the relationship in the Name box (e.g., LowLeveeTOL946), and enter a description for the relationship (e.g., The stage-discharge function below represents the with-project condition for a low levee. Observe that some stages are higher for a given discharge.).

  3. For Distribution Type, select Triangular and use the information in Table 3 to create the new stage-discharge relationships for the with-project condition.

    Table 3

    Loading

  4. Click Save. 

Task 3.2 – Enter Stage-Discharge Functions for High Levee

The top of levee for this high levee is 947.5 ft.

Steps

  1. From the Study Tree, right-click on Stage-Discharge Functions and select Create New Stage-Discharge Relationship. The Create New Stage-Discharge Relationship opens as a tab.
  2. Enter a name for the relationship in the Name box (e.g., HighLeveeTOL947.5), and enter a description for the relationship (e.g., The stage-discharge function below represents the with-project condition for a high levee. Observe that some stages are lower for a given discharge.).

  3. For Distribution Type, select Triangular and use the information in Table 4 to create the new stage-discharge relationships for the with-project condition.

    Table 4

    Loading

  4. Click Save.

Task 4 – Enter the Three Lateral Structures

For each levee, follow the instructions below to create two new lateral structures.

Note

The user defined system response curves have less data than the default curve. After you select User Defined you will need to delete the extra rows. To delete extra rows, highlight the extra rows, right-click inside a highlighted cell, and click Delete Row(s). Then copy the provided system response curve into the table.

  • From the Study Tree, right-click on Lateral Structures and select, Create New Lateral Structure. The Create New Lateral Structure dialog opens as a tab. Enter the appropriate levee system name, description, top of levee elevation, and system response curve, and Save each levee.

  • Use the Create New Lateral Structure dialog to add the following two levees:
    1. Name: LowLevee-noArmor; Description: With-project scenario for proposed low levee without armor for the left-bank with a top elevation of 946 feet.
      1. Top of Levee Elevation: 946
      2. System Response Curve:

        Loading

      3. Click Save and Close to close the dialog.
    2. Name: LowLevee-Armored; Description: With-project scenario for proposed low levee with armor for the left-bank with a top elevation of 946 feet.
      1. Top of Levee Elevation: 946
      2. System Response Curve:

        Loading

      3. Click Save and Close to close the dialog.
    3. Name: HighLevee; Description: With-project scenario for proposed high levee for the left-bank with a top elevation of 947.5 feet.
      1. Top of Levee Elevation: 947.5
      2. System Response Curve:

        Loading

      3. Click Save and Close to close the dialog. 

Task 5.1 – Compute With-Project (Low Levee) Aggregated Stage-Damage Functions

For both analysis years create the aggregated stage-damage functions for the Low Levee:

  1. From the Study Tree, under Economics, right-click on Aggregated Stage-Damage Functions and select Create New Stage-Damage Functions. The Create New Stage-Damage Functions opens as a tab.
  2. Enter an appropriate name for the new function (e.g., Base-WP-LL and Future-WP-LL for the base year and future year, respectfully) in the Name box and a description for the relationship.
  3. Enter the appropriate Analysis Year: (base year is 2031, future year is 2080)
  4. Select the Computed radio button and enter the information identified below (if you've been following the naming convention identified in the workshops your options should be the same).
  5. After you complete the configuration, click Compute Curves. Wait until HEC-FDA generates the curves. Scroll through the list of computed curves (you should generate 28 curves). 
  6. Click Save and the created stage-damage function displays in the Study Tree. 
  7. Click Close to close the dialog.

Task 5.2 – Compute With-Project (High Levee) Aggregated Stage-Damage Functions

For both analysis years create the aggregated stage-damage functions for the High Levee:

  1. From the Study Tree, under Economics, right-click on Aggregated Stage-Damage Functions and select Create New Stage-Damage Functions. The Create New Stage-Damage Functions opens as a tab.
  2. Enter an appropriate name for the new function (e.g., Base-WP-HL and Future-WP-HL for the base year and future year, respectfully) in the Name box and a description for the relationship.
  3. Enter the appropriate Analysis Year: (base year is 2031, future year is 2080)
  4. Select the Computed radio button and enter the information identified below (if you've been following the naming convention identified in the workshops your options should be the same).
  5. After you complete the configuration, click Compute Curves. Wait until HEC-FDA generates the curves. Scroll through the list of computed curves (you should generate 28 curves). 
  6. Click Save and the created stage-damage function displays in the Study Tree. 
  7. Click Close to close the dialog.

Task 6.1 – Create Scenarios for the Three Proposed Levees

The Without Base Year and Without Future Year scenarios have been created for you, but now you need to create new scenarios for the three proposed levees for both analysis years. Table 4 provides an overview table of the new base year and future year with-project scenarios. 

Table 4: Levee Scenarios Overview

Base Year With-project Scenarios

ScenarioYearImpact AreaStage-DamageFrequency RelationshipStage-DischargeLateral StructureThreshold Stage
Base-LLnoA2031Left-BankBase-WP-LLFlow-Frequency LPIIILowLeveeTOL946LowLevee-noArmor(set by selected lateral structure)
Right-BankBase-WP-LLFlow-Frequency LPIIILowLeveeTOL946
User-Defined*
Base-LLwA2031Left-BankBase-WP-LLFlow-Frequency LPIIILowLeveeTOL946LowLevee-Armored(set by selected lateral structure)
Right-BankBase-WP-LLFlow-Frequency LPIIILowLeveeTOL946
User-Defined*
Base-HL2031Left-BankBase-WP-HLFlow-Frequency LPIIIHighLeveeTOL947.5HighLevee(set by selected lateral structure)
Right-BankBase-WP-HLFlow-Frequency LPIIIHighLeveeTOL947.5
User-Defined*

Future Year With-project Scenarios

ScenarioYearImpact AreaStage-DamageFrequency RelationshipStage-DischargeLateral StructureThreshold Stage
Future-LLnoA2080Left-BankFuture-WP-LLFlow-Frequency LPIIILowLeveeTOL946LowLevee-noArmor(set by selected lateral structure)
Right-BankFuture-WP-LLFlow-Frequency LPIIILowLeveeTOL946
User-Defined*
Future-LLwA2080Left-BankFuture-WP-LLFlow-Frequency LPIIILowLeveeTOL946LowLevee-Armored(set by selected lateral structure)
Right-BankFuture-WP-LLFlow-Frequency LPIIILowLeveeTOL946
User-Defined*
Future-HL2080Left-BankFuture-WP-HLFlow-Frequency LPIIIHighLeveeTOL947.5HighLevee(set by selected lateral structure)
Right-BankFuture-WP-HLFlow-Frequency LPIIIHighLeveeTOL947.5
User-Defined*

* The "User-Defined" instructions are provided below.

Steps to Create With-Project Scenarios

Use these instructions and Table 4 to create the three new base year scenarios and three new future year scenarios:

  1. From the Study Tree, right-click on Scenarios and select Create New Scenario. The Create New Scenario dialog opens as a tab.
  2. Enter a name for the new scenario in the Name box (e.g., see Table 4), and enter a description.
  3. Enter the Year: (base year is 2031 and future year is 2080).
  4. From the Stage-Damage list use Table 4 to select the appropriate stage-damage function. 
  5. From the Left-Bank Impact Area tab: 
    1. Recall that the left-bank impact area contains the proposed levee, so you need to select the appropriate levee created in Task 4 for each scenario (as identified in Table 4) and the appropriate stage-discharge function that you created in Task 3.  
    2. Select the following for the Left-Bank impact area:

  6. From the Right-Bank Impact Area tab:
  7. The right-bank impact area does not contain the levee; therefore, do not add a lateral structure. However, the right-bank still requires the with-project condition stage-discharge function imported in Task 3.
    1. Select the following for the Right-Bank impact area:

    2. Now you must enter the Threshold Stage manually. Uncheck the Calculate Default Threshold checkbox and enter the project performance threshold in the Threshold Stage box and in HEC-FDA Version 2.0.

      Threshold Stage (Right-Bank)

      Review the Target Threshold section of the Scenarios page in HEC-FDA User Manual. As explained in this section, for impact areas without levees, and for scenarios that reflects with-project conditions, then the user must enter the threshold stage as the default threshold stage from the without-project condition (for the specific analysis year). With-project system performance then reflects the stage at which significant damage begins in the without-project condition.

      Warning!

      This quick how-to does not show you the value you should enter for your study, instead it just shows you how-to find the value. Please use your own Without Base Year scenario to determine the appropriate Threshold Stage value to set for the Right-Bank impact area.

      Quick How-to find a without-project scenario's threshold stage

    3. The default Damage Category selection is RES and Asset Category selection is Structure. Click Preview Compute.

  8. Click Save, and click Close.
  9. Repeat these steps until you've created three new base year with-project scenarios and three new future year with-project scenarios (as outlined in Table 4).

Task 6.2 – Compute All Scenarios

Compute the new Levee scenarios:

  1. From the Study Tree, right-click on Scenarios and click Compute Scenarios.
  2. From the Compute Scenarios tab, click the checkbox to select the new scenarios, and then click Compute. A message box opens asking if you'd like to view the results. Click Yes.
  3. The Summary Results tab opens. Close the Compute Log tab.

Task 7 – Create and Compute Three Alternatives for the Three Proposed Levees

Create and Compute Three Alternatives

Use the instructions below to create the three alternatives, one for each of the three proposed levees. 

  1. From the Study Tree, right-click on Alternative and select Create New Alternative. The Create New Alternative dialog opens as a tab.
  2. Enter a name (see example names below) and a description for the new alternative.

    1. Low Levee without Armor: LowLevee_noArmor
    2. Low Levee with Armor: LowLevee_Armored
    3. High Levee: HighLevee
  3. From the Base Year Scenario box, select the appropriate base year scenario you created in Task 6; and from the Year box, enter: 2031.
    1. Low Levee without Armor, select: Base-LLnoA
    2. Low Levee with Armor, select: Base-LLwA
    3. High Levee, select: Base-HL
  4. From the Future Year Scenario box, select the Future Year Levee 1 scenario you created in Task 6; and from the Year box, enter 2080.
    1. Low Levee without Armor, select: Future-LLnoA
    2. Low Levee with Armor, select: Future-LLwA
    3. High Levee, select: Future-HL
  5. Click Save and Close.
  6. From the Study Tree, right-click on the created alternative, and click View Results. Close the Compute Log.

  7. Repeat these steps until you've created three new with-project alternatives. 

Task 8 – Create and Compute an Alternative Comparison Report

  1. From the Study Tree, right-click on Alternative Comparison Report and select Create New Alternative Comparison Report. The Create New Alternative Comparison Report dialog opens as a tab.
  2. Enter a name for the new alternative comparison report in the Name box (e.g., Comparison), and enter a description (e.g., alternative comparison report to provide damage reduced between the without-project condition and with-project conditions).
  3. From the Without Project list select: Without Project.
  4. From the With Project list select (if you use the same naming convention described in Task 7): LowLevee_noArmor.
  5. Click Add Comparison. From the newly added With Project list select: LowLevee_Armored.
  6. Click Add Comparison. From the newly added With Project list select: HighLevee.

  7. Click Save. Click Close. The new comparison report is added to the Study Tree.
  8. From the Study Tree, right-click on the created comparison report, and click View Results. Close the Compute Log.

Workshop Discussion Questions

Project Performance

Review the Project Performance reports to answer the following questions.

Test Your Knowledge - Question 1

Pursuant to ECB 2019-11 (hold Ctrl while clicking to open in another tab), do any of the levee plans meet FEMA’s criteria for NFIP levee accreditation?

You will have to identify the computed assurance of the 1% AEP event using the Annual Exceedance Probability report under Performance outcomes for both levees.  The following ranges of assurance determine the accreditation recommendation:

Assurance for the 1% AEP

Recommendation

Assurance < 65%

Do not accredit

Assurance > 85%

Accredit

65% ≤ Assurance ≤ 85%

More evidence is needed to accredit

Test Your Knowledge - Question 2

Nonfederal sponsors and members of the vertical team are often interested in knowing what a levee's level of risk reduction is in terms of return interval years (e.g., A team with a levee providing 1% annual chance flood risk reduction could say "This is a 100-year levee").  If the criteria for this statement is having 90% assurance that the event would not exceed the levee height, what statement could be said about the high levee?

Test Your Knowledge - Question 3

What is the probability that High Levee will experience overtopping in the next 30 years?

Hint: Look for the Long-Term Exceedance Probability in the Base_HL Scenario results.

Test Your Knowledge - Question 4

What is the fifty percent exceedance probability average annual equivalent (AAEQ) damage reduced value for low levee no armor for the Left-Bank?

Hint: Take a look at the Alternative Comparison Report results tables.

Test Your Knowledge - Question 5

Is it always correct to assume that the without-project conditions and with-project conditions stage-discharge (rating) function is the same for a levee project?  Why?  How would you account for a difference using HEC-FDA.

Hint: For a flood-level volume of water, if the water cannot spread out into the floodplain, what does it do? 

Conclusion

Download the solution project below to compare to your project:

Review the best answers to test your FDA knowledge questions and compare with yours to see how you did!

Return to top of page.

Best Answers to Test Your FDA Knowledge Questions

Note: Your results may not exactly match the results shown here. That's a product of variation in the software since this workshop was created and does not indicate that you did something wrong. Your results should follow the same trends and the values should be somewhat close to the ones shown below.

Test Your Knowledge - Question 1

Pursuant to ECB 2019-11 (hold Ctrl while clicking to open in another tab), do any of the levee plans meet FEMA’s criteria for NFIP levee accreditation?

You will have to identify the computed assurance of the 1% AEP event using the Annual Exceedance Probability report under Performance outcomes for all levees.  The following ranges of assurance determine the accreditation recommendation:

Assurance for the 1% AEP

Recommendation

Assurance < 65%

Do not accredit

Assurance > 85%

Accredit

65% ≤ Assurance ≤ 85%

More evidence is needed to accredit

Answer: No. None of the levees demonstrate assurance of the 1% AEP in ranges in the above table.

Test Your Knowledge - Question 2

Nonfederal sponsors and members of the vertical team are often interested in knowing what a levee's level of risk reduction is in terms of return interval years.  If the criteria for this statement is having 90% assurance that the event would not exceed the levee height, what statement could be said about the high levee?

Answer: The annual exceedance probability (AEP) with 90% assurance has been computed as 0.0534.

The policy-compliant simplified communication (per paragraph 8j(5) of ER 1105-2-101) would be : “Given irreducible uncertainties inherent in flood frequency analysis, the Levee 3 Plan will pass the 5.3% event with 90% assurance.”


Test Your Knowledge - Question 3

What is the probability that the high levee will experience overtopping in the next 30 years?

Hint: Look for the Long-Term Exceedance Probability in the Scenario results.

Answer: .6369, or ~64%

Test Your Knowledge - Question 4

What is the fifty percent exceedance probability equivalent annual damages reduced value for low levee no armor for the Left-Bank? 

Hint: Take a look at the Alternative Comparison Report results tables.

Answer: $917,010.16

Test Your Knowledge - Question 5

Why is there a with-project condition rating curve?

Answer: A levee restricts water to the channel that would have otherwise spread out in the area now kept dry by the levee, so the stages increase for a given level of flow.