Overview

The table below displays the HEC-ResSim operational calculations validation and verification reports.

This is the list of HEC-ResSim's operational calculations to be verified and validated. Initial test cases have been developed for three of these operational features: Projected Elevations, Release Allocations, and Overrides. Documentation of test results follows. Further expansion on these tests can be used to validate more complex scenarios that go beyond the basic calculations.

  1. Hydropower
  2. Zones
    1. GC
    2. Inactive
    3. Top most zone
    4. Zone boundary
  3. Release function rules
  4. Rule priorities
  5. System operation
    1. system balance
    2. Tandem
    3. Parallel
    4. system hydropower
  6. Pump Operation
  7. Release allocation
  8. ROC
    1. By themselves
    2. for influence on GC
  9. Prescribed release rule
  10. Scripted rules
  11. State Variables (Initialization/iteration/passes/when it is computed/always compute)
  12. Downstream control operation, Pulse flow
  13. If Blocks
  14. Override - Table
  15. Override - OSI
  16. Induced surcharge operation
  17. Water accounting
  18. Projected elevation
  19. Storage credit
  20. Outages
  21. Hotstart